Skip to content

Leading to the flume


A concrete channel (flume) was built to lead the water from the dam into the wooden flume which, in turn, would transport water the couple of kilometres (over a mile) to the edge of the gorge where it was dumped into the penstock leading to the turbine.

[At the site of Australia’s first commercial hydyo-electric power-generator near Armidale]

Leave a Reply